
Warehouse Bolt Hole Filling & Make-Good Floor Repairs — Christchurch
End-of-lease make-good and reinstatement specialists. We cut dynabolts and anchors flush and fill the holes with high-strength epoxy filler — smooth, easy to clean, forklift-safe and landlord-ready.
Floor repair and make-good work: Christchurch and immediate surrounds only.
Working to a handover date? Tell us the date and we'll confirm if we can meet it.
Industrial tenants, landlords and property managers across Christchurch rely on us for fast, tidy repairs to marked-up warehouse floors. Whether you're removing machinery, relocating racking or preparing a unit for handover, we cut protruding dynabolts flush and fill the holes so the slab looks clean, sweeps and scrubs easily, and won't damage forklift tyres. Before-and-after photos supplied for your make-good file.
Dynabolt Removal & Lease Reinstatement — Done Properly
When a warehouse tenancy ends, the lease typically requires a full reinstatement of the floor. What tenants know as make good, property managers and building surveyors call reinstatement — but the work is the same: dynabolt removal, rack bolt removal, anchor bolt removal, and filling every hole flush with the surrounding slab.
Protruding dynabolts, abandoned anchor points and old line markings are among the most common reasons a make-good claim is disputed or a bond is withheld. We carry out warehouse floor repair in Christchurch and concrete floor repair Christchurch-wide, understanding the tight timelines — handover dates, bond disputes, and new-tenant fit-outs — and we schedule to meet them.
Whether it's lease reinstatement a landlord is requiring or an end of lease floor repair a tenant is organising before handing back the keys, we carry out every job to the same standard: flush, clean, and documented.
What We Do
- ✓Cutting and grinding protruding dynabolts, rack bolts and chemical anchors flush to the slab
- ✓Filling bolt holes and machine base pockets with high-strength epoxy filler, finished level with the surrounding floor
- ✓Removal of old adhesive, glue residue, coatings and epoxy pads left behind by plant and racking
- ✓Grinding out redundant line marking so old layouts don't confuse forklift operators
- ✓Re-marking the incoming tenant's racking layout, aisles, walkways and loading zones in the same visit
- ✓Before-and-after photo documentation for make-good and bond release
Before
AfterWhy Bolt Holes Need to Be Fixed
Trip hazard and tyre damage. Protruding dynabolts are a trip hazard and will cut forklift and pallet-jack tyres — creating a health and safety liability and expensive downtime.
Hard to clean. Open holes trap water, dust and debris and make the floor hard to sweep and scrub.
Bond disputes. A floor left full of holes and old markings is a common reason a make-good claim is held against a tenant's bond.
New tenant requirements. Incoming tenants need a clean slab because their racking layout won't sit where the last one did.
For Tenants, Landlords and Property Managers
Tenants
Meet your make-good obligations before handover and avoid deductions or a landlord claim.
Landlords & Property Managers
Get the unit floor-ready for re-lease with old markings ground out and anchor points filled.
Racking Installers & Fitout Contractors
We handle the floor while you handle the racking. Work scheduled around your programme.
Why We Quote On Site
Every warehouse floor is different. Hole sizes, anchor types, floor condition and the distance to available power all affect what the job takes. We assess on site and quote from what we see, not from a photo. Site assessments are free and usually booked within 48 hours.
Book a Free Site Assessment
Fill in the details below and we'll be in touch to book a time — usually the same working day.
Is the racking or machinery still in place? *
Is there mains power available in the work area? *
Frequently Asked Questions
Is this a structural repair?
No. This is a cosmetic surface repair to make the floor smooth, clean and safe for foot and forklift traffic. We do not do structural or engineered slab repair.
Can you quote from photos?
No. Hole sizes, anchor types, floor condition and power access all affect the job, so we assess on site. Assessments are free and usually booked within 48 hours.
What areas do you cover for floor repairs?
Christchurch and immediate surrounds. Our line marking service covers Canterbury more widely.
How long does it take?
Most warehouse units are completed in one to two days depending on the number of anchor points.
Can you work to our handover date?
Yes. Tell us the date and we'll schedule around it, including after-hours and weekends where needed.
Do you provide documentation?
Yes. Before-and-after photos for your make-good or reinstatement file.
Do you re-mark the floor for the new layout?
Yes. We can grind out the old markings and mark the new tenant's layout in the same visit.
Related Services
Book a Free Site Assessment
Fast, tidy warehouse floor reinstatement — Christchurch and immediate surrounds.
📋 NZ Warehouse Safety Marking Rules
Forklift lanes, pedestrian walkways, hazard zones — all WorkSafe NZ requirements explained in plain English.
Line Marking NZ is a trading name of RTC Concrete Grinding Ltd. Floor repair and make-good work: Christchurch and immediate surrounds. Line marking: Canterbury-wide.